Survey of Dublin’s medieval city
Bruton asked when the survey would be completed and what proportion was done. Tunney could give neither a timetable nor proportion, citing several completed excavations instead; Bruton challenged that these did not answer his question about surveys, before the Chair moved to the next question.
asked the Minister for Education in respect of the joint study on urban archaeology being undertaken by the National Museum and the Office of Public Works when it is expected the survey of the entire area within the medieval walled city of Dublin will be completed.
Comment on this
Will the Minister state approximately what proportion of the area of the medieval walled city of Dublin has already been completed?
Comment on this
It is not possible to say that. I hope when the Deputy is talking about the walled city he is also including the area without walls, which is equally important. High Street, 1 and 2, Winetavern Street, Christchurch Place and Fishamble Street have been completed.
Comment on this
The Deputy is rather lost in his enthusiasm when he does not realise that there is not much point in surveying something which has already been completed on behalf of the museum and on behalf of the nation.