Ceisteanna—Questions. Oral Answers. - Connection with Continental Electricity Grid.
- Interconnector capacity and backup 6 speeches
The Minister said an interconnector could provide backup and save about 200 MW of installed ESB capacity, based on two 250 MW cables. He agreed the missing link created serious problems; restoration was being pursued but was not directly under Government control.
Barry Desmond, George Colley, John Horgan
- Cost and priority of a British connection 6 speeches
The estimated cost of a new Ireland–Britain link was £80–£90 million, based on a 1978 study, with an updated estimate requiring further study. The Minister said the cost did not include the existing Northern Ireland connection and that the project had very high priority.
Barry Desmond, George Colley, John Horgan
andMr. Quinn asked the Minister for Energy the additional energy capacity and supply available to the Irish economy in the event of connection directly across the Irish Sea to the electricity grid of the Continent and the United Kingdom.
Comment on this
The primary purpose of an inter connector from our point of view would be to provide a back-up facility which would save approximately 200 megawatts of installed capacity on the ESB system.
Comment on this
The normal practice is that whatever capacity is decided on for cable and plant at either end must be duplicated to allow for breakdown. In this case the estimates are based on two cables of 250 megawatts and that amounts, for technical reasons, to a net saving of installed capacity at 200 MW.
Comment on this
Could the Minister give the House any indication of whether there has been any progress towards the reconnection of the link that used to exist which would have provided us with this back-up service, and whether he agrees that the continued absence of this back-up service, as the events of the past few months have shown, presents very serious problems for this country?
Comment on this
I agree fully with what the Deputy said. As regards the first part of his question, the matter is being continuously pursued. The Deputy will appreciate that the restoration of that connector link is not a matter that is directly under the control of the Government.
26.
Comment on this
andMr. Quinn asked the Minister for Energy the cost to this State of a connector to link up the Irish Republic electricity grid with that of the Continent through the United Kingdom grid at Wales.
Comment on this
I am informed by the ESB that the estimated cost of the link, including all terminal equipment as projected in a study carried out in 1978, was in the range of £80 million to £90 million, depending on the route chosen. A further study would be required to give a more up-to-date estimate.
Comment on this
Could the Minister relate this figure to the existing link up that connects this jurisdiction with the one in Northern Ireland? Is that included in the £80 million to £90 million or would that figure be in addition to the work that has already been done on the plans that already exist for that connection?