Ceisteanna—Questions. Oral Answers. - Local Authority Projects.
- Cost efficiency of local authority projects 2 speeches
The Minister said departmental controls and local authorities’ own procedures provide a reasonable basis for ensuring efficient spending on major works.
Bernard Allen, Fergus O'Brien
- Local road maintenance and safety 3 speeches
Leonard alleged that some authorities neglected road safety and maintenance; the Minister said authorities decide how to use block and strengthening grants, and Leonard urged them to spend adequately on safety.
James Leonard, Fergus O'Brien
- Kildare engineering costs and oversight 7 speeches
Power cited figures showing administration accounted for 77% of certain engineering works’ costs and urged stronger value-for-money oversight. The Minister said he needed to verify the facts and that allocations reflect how counties spend; he acknowledged he did not read the Kildare papers.
Patrick Power, Fergus O'Brien, Thomas J. Fitzpatrick, Tomás MacGiolla
- Sick leave costs among local authority workers 2 speeches
Brady questioned cost efficiency after citing extensive sick leave among local authority manual workers. The Minister said he could not comment on certified illnesses without casting doubt on medical professionals.
Gerard Brady, Fergus O'Brien
asked the Minister for the Enviornment if he is satisfied that the moneys allocated to local authority projects are being spent efficiently; and if his Department have carried out any study of the cost-efficiency of such projects.
Comment on this
The aim of achieving cost efficiency is one of the reasons for the various controls and procedures operated by my Department in relation to expenditure by local authorities on the implementation of the major works programme for which funds are allocated to them. I am satisfied that these controls allied to the procedures operated by local authorities themselves are a reasonable approach towards ensuring cost efficiency, when account is taken of the statutory responsibilities of the local authorities and of their own accountability for their expenditure. While formal studies of cost efficiency have not been carried out on individual local projects by the Department, cost trends are constantly appraised in order to ensure that the controls and procedures continue to fulfil their purpose.
Comment on this
The Minister of State has seen fit to monitor the amount spent on realignment of roads and such like, but would he agree regarding the maintaince of roads that, especially during the last storm, anyone travelling from here to the Tyrone border on the Derry road would agree that of four local authorities concerned some spent a considerable amount of money in making the roads secure and safe and others seemed to neglect them?
Comment on this
That is a slightly different approach. Local authorities are given block grants to do that and are given additional grants for the strengthening of roads. We give the grants and it is a matter for local authorities to carry out the work. When local authorities get money the problem is that they complain that they are not getting enough. I am surprised that somebody tells me they are not spending their money to do jobs.
Comment on this
I ask the Minister of State to ensure that they spend their money on safety on the roads. Some of them were not spending as much as they should on that.
Comment on this
Would the Minister of State agree that a cost benefit analysis and an inquiry into value for money in his Department are very important? Is he aware that the breakdown of certain engineering works in one county revealed that administration cost 77 per cent of the money and materials cost 23 per cent? Does he not agree that that type of breakdown would not be condoned for a moment by any private individual or authority?
Comment on this
Would not the fact that this appeared in a local paper in County Kildare and was not challenged be sufficient? The figures were given by the local authority. If the Minister of State were carrying out his duty in a proper watchdog manner would it not have engaged his attention before now?
Comment on this
With regard to cost efficiency, is the Minister of State aware that in one year 5,000 manual workers within a senior local authority lost in sick pay 320 years when 21,000 medical certificates were issued? How can he regard that as cost efficiency?