We use Google Analytics to see which pages are read and how the site is used, so we know what to improve. This only runs if you accept. See our privacy notice for details.

Dáil

Other Questions. - Coastal Erosion.

David Stanton Mr. Stanton Question Fine Gael

33 Mr. Stanton asked the Minister for the Marine and Natural Resources if he has received a report dealing with coastal erosion in the Youghal area of County Cork; if so, the actions he plans to take as a result; and if he will make a statement on the matter. [3660/02]

Comment on this

Three evaluations by consultant engineers have been undertaken on behalf of Cork County Council since 1999 to assess the extent of coastal erosion at Youghal and to identify the most appropriate and cost-efficient coast protection solutions. The most recent report was completed last year and recommends a phased approach to addressing coastal erosion in the area commencing with the strengthening of the sea wall and the subsequent construction of groynes. My Department provided funding towards two of these reports and has assessed all three evaluations.

I allocated £20,000, €25,394.76, in 2001 to Youghal Urban District Council. I am advised that consultants have prepared the necessary tender documentation on behalf of the local authority and that planning and other statutory permissions are being progressed.

Comment on this

Does the Minister agree it is bizarre that three reports have been carried out on this matter? On 24 March 1999 his predecessor told me that a detailed report was carried out by consulting engineers which concluded that coastal protection works involving the extension of groynes and beach nourishment were required at an estimated cost of £5.1 million. Nothing has happened since. We have had paralysis by analysis. Two more reports have been assessed by the Minister and his officials yet no real money has been made available. Nothing is happening while the beach is being washed away and terrible damage is being done. When does the Minister propose to initiate real action after four years?

Comment on this

I have not seen a figure of the magnitude suggested by the Deputy. Did he mention £5 million?

Comment on this

The Minister's predecessor stated the work would cost £5.1 million.

Comment on this

My figures suggest an estimated cost of about €1.2 million for the strengthening of the sea wall, incorporating an aesthetically designed retired flood wall. The subsequent groynes which are proposed are estimated to cost €3.4 million on a phased basis. It is considered that priority should be given to the strengthening of the sea wall. That is the basis on which the allocation is being made and the tender documents are being prepared.

Comment on this

A sum of £20,000 has been made available for work which has not taken place and there is some money for consultants. However, no work has occurred on the ground after four years. The Minister does not seem to know about this detailed report which his predecessor had on 24 March 1999. I do not know how long the report was lying in the Department prior to that date, but does the Minister agree this is incompetence of the highest order and that action has to be taken? After four years it is not good enough that nothing has happened.

Comment on this

I do not know what the urgency is all about because this is the first time I have heard from the Deputy regarding this matter.

Comment on this

That is not so.

Comment on this

As far as I am concerned the matter is with the local authority. I provided the money in 2001 and I am waiting for the various planning and tendering procedures to proceed.

Comment on this

I raised this matter with the Minister on 10 May. This is not the first time I have done so.

Comment on this
Rory O'Hanlon An Leas-Cheann Comhairle Fianna Fáil

Please allow the Minister to respond and I will then call Deputy Sheehan.

Comment on this

This is the first time the Deputy has raised this matter during Question Time which is where his colleagues normally raise urgent matters.

Comment on this

That is not so.

Comment on this
Rory O'Hanlon An Leas-Cheann Comhairle Fianna Fáil

Please allow the Minister to respond.

Comment on this

The Minister should not try to mislead the House. He should admit he is wrong.

Comment on this
Rory O'Hanlon An Leas-Cheann Comhairle Fianna Fáil

We have gone over time and I wish to call Deputy Sheehan.

Comment on this

On a point of order.

Comment on this
Rory O'Hanlon An Leas-Cheann Comhairle Fianna Fáil

I ask the Deputy to give way to Deputy Sheehan.

Comment on this

The Minister made a statement which is verifiably wrong on the basis of the record of the House. The Chair should afford the Minister an opportunity to apologise.

Comment on this
Rory O'Hanlon An Leas-Cheann Comhairle Fianna Fáil

That is not a point of order. The Minister was on his feet. I call Deputy Sheehan.

Comment on this

The Minister made a statement which is verifiably wrong and he should apologise.

Comment on this
Rory O'Hanlon An Leas-Cheann Comhairle Fianna Fáil

We must move on to the next question. Deputy Sheehan has been patient all afternoon.

Comment on this

I do not wish to mislead the House.

Comment on this

Then the Minister should stop telling lies.

Comment on this
Rory O'Hanlon An Leas-Cheann Comhairle Fianna Fáil

I ask the Deputy to withdraw the term "telling lies".

Comment on this

The Minister made a statement which is entirely at variance with the record of the House.

Comment on this
Rory O'Hanlon An Leas-Cheann Comhairle Fianna Fáil

I ask the Deputy to withdraw the term "telling lies".

Comment on this

I withdraw the term, but I ask the Minister to correct the untruth he told a few moments ago. He is not going to get away with this.

Comment on this
Rory O'Hanlon An Leas-Cheann Comhairle Fianna Fáil

The Deputy is being disorderly.

Comment on this

I am happy to clarify that this is the first occasion during Question Time on which Deputy Stanton raised this issue.

Comment on this

That is not so.

Comment on this

If Deputy Stanton raised the matter by way of a written question, I was not aware of that.

Comment on this

The Minister is wrong and he should be man enough to apologise.

Comment on this
Rory O'Hanlon An Leas-Cheann Comhairle Fianna Fáil

The Deputy will have to find another way of dealing with this matter.

Comment on this

If Deputy Dukes is so pernickety I will not—

Comment on this
Rory O'Hanlon An Leas-Cheann Comhairle Fianna Fáil

Please allow Deputy Sheehan to speak. He has been patient all afternoon and he is entitled to ask a supplementary question.

Comment on this

The Minister should not be a gurrier all the time.

Comment on this

How much money did the Department spend on coastal erosion in 2002? How much money was allocated to County Cork? Cork is the largest county and comprises one eighth of the entire country. The county has suffered coastal erosion for the past 25 years. The greater part of my constituency is falling into the Atlantic Ocean, but the Minister is doing nothing. How much money was spent on coastal erosion last year and how much was spent on County Cork?

Comment on this
Rory O'Hanlon An Leas-Cheann Comhairle Fianna Fáil

We have moved outside the realm of the question. I will allow a final reply from the Minister.

Comment on this

The total amount provided for coastal erosion under the national development plan by the Minister for Finance is €44 million. I am not sure of the amount spent last year, but the provision for this year is about €6 million which is a sizeable figure and more than has been spent in the past.

I wish to clarify that it was not my intention to mislead the House. I was not thinking in terms of a written question which might have been tabled some time ago. I was referring to the fact that this is the first time this issue was raised during oral questions.

Comment on this

So no money has been spent on Cork.

Comment on this