The Minister said landlords may terminate tenancies for substantial refurbishment or renovation, subject to strict health-and-safety certification and an obligation to offer the tenant a return, but demolition is not a separate ground. He has no immediate plans to amend the tenancy laws.

1137. Deputy Pádraig Mac Lochlainn asked the Minister for Housing, Local Government and Heritage the reason demolition, even if required under the defective concrete blocks grant scheme (Option 1), is not listed as a permitted ground for terminating a tenancy during the six-year TMD for small landlords, nor at any time for large landlords, except at the end of the TMD for small landlords under the ground of substantial refurbishment or renovation; and if he will seek a resolution. [77560/26]

Comment on this
James Browne Minister for Housing, Local Government and Heritage Fianna Fáil

The Remediation of Dwellings Damaged by the Use of Defective Concrete Blocks Act 2022 (the Act of 2022) provides for the payment of grants for the remediation of certain dwellings damaged by the use of defective concrete blocks in their construction.

Section 9(3)(b) of the Act of 2022 provides for the grant for a vacant former rental property provided a tenancy of that dwelling stood registered with the Residential Tenancies Board (RTB) on or before 1 November 2021.

The precise timing of the carrying out of the necessary works to avail of the grant is a matter for any landlord, within the confines of the Act of 2022.

The Residential Tenancies Acts 2004 to 2026 (the RTA) regulate the landlord-tenant relationship in the rented residential sector and set out the rights and obligations of landlords and tenants.

From 1 March 2026, the Residential Tenancies (Miscellaneous Provisions) Act 2026 provides for a national rent control which allows the resetting of rents for new tenancies to market rent, subject to certain conditions, and significantly strengthens security of tenure for tenants.

It is lawful under the RTA for a landlord of a tenancy that commenced before 1 March 2026 to terminate the tenancy on the ground of substantial refurbishment or renovation, including a relevant dwelling under the Defective Concrete Blocks Grant Scheme that was subject to a tenancy on 1 November 2021 and stood registered with the RTB on that date.

The RTA strictly limits the termination of a tenancy on the ground of substantial refurbishment or renovation to works that are certified for health and safety reasons to require at least 3 weeks of vacant possession to complete. In the case of a tenancy termination on this ground, the landlord must offer to re-let the dwelling to the tenant upon completion of the works.

Paragraph 5 of the Table to section 34 of the RTA - revisedacts.lawreform.ie/eli/2004/act/27/section/34/revised/en/html - and section 35 of the RTA - revisedacts.lawreform.ie/eli/2004/act/27/section/35/revised/en/html - provide for the termination of a tenancy where the landlord intends to substantially refurbish or renovate the dwelling, or the property containing the dwelling, in a way which requires the dwelling to be vacated for that purpose (and, where planning permission is required for the carrying out of that refurbishment or renovation, that permission has been obtained) and the notice of termination (the “notice”) contains or is accompanied, in writing, by a statement—

• specifying the nature of the intended works,

• that, in a case where planning permission has been obtained, a copy of the planning permission is attached to the notice or statement,

• that planning permission is not required and the notice specifies

- the name of the contractor, if any, employed to carry out the intended works, and

- the dates on which the intended works are to be carried out and the proposed duration of the period in which those works are to be carried out, and

• that the landlord, by virtue of the notice, is required to offer to the tenant a tenancy of the dwelling if the dwelling becomes available for reletting by reason of the completion of the works of refurbishment or renovation.

In addition, the notice must contain or be accompanied by a certificate in writing of a registered construction professional (within the meaning of the Regulation of Providers of Building Works and Miscellaneous Provisions Act 2022 (www.oireachtas.ie/en/bills/bill/2022/2/)) stating that—

• the proposed refurbishment or renovation works would pose a risk to the health or safety of the occupants of the dwelling concerned and should not proceed while the dwelling is occupied, and

• such a risk is likely to exist for such period as is specified in the certificate which shall not be less than 3 weeks.

Where a tenant accepts an offer of a re-let on completion of the refurbishment or renovation works, occupation by the tenant under the tenancy on foot of that agreement shall, together with his or her occupation under the former tenancy, be regarded as continuous occupation by the tenant under the one tenancy, for the purposes of the RTA.

Section 54 of the RTA provides that no provision of any lease, tenancy agreement, contract or other agreement may operate to vary, modify or restrict in any way a provision of Part 4 (Security of tenure) of the RTA.

It is lawful for all landlords to terminate a tenancy (created at any time) that has existed for less than 6 months (i.e. a non Part 4 tenancy) by serving a notice of termination that complies with section 62 of the RTA - revisedacts.lawreform.ie/eli/2004/act/27/revised/en/html#SEC62; paragraph (1)(da) is of particular relevance. The reasons to terminate a Part 4 tenancy (of 6 months or more) are limited to those grounds set out in the Table to section 34 of the RTA: revisedacts.lawreform.ie/eli/2004/act/27/revised/en/html#SEC34

Where a landlord is not a company and has 3 or fewer tenancies, the RTA allows a landlord of a 6 year Tenancy of Minimum Duration that commenced on or after 1 March 2026 to terminate that tenancy on the ground of substantial refurbishment or renovation at the end of the 6 year term.

Section 12(1)(b) of the RTA obliges a landlord to carry out to—

(i) the structure of the dwelling all such repairs as are, from time to time, necessary and ensure that the structure complies with any standards for houses for the time being prescribed under section 18 of the Housing (Miscellaneous Provisions) Act 1992 (www.irishstatutebook.ie/eli/1992/act/18/section/18), and

(ii) the interior of the dwelling all such repairs and replacement of fittings as are, from time to time, necessary so that that interior and those fittings are maintained in, at least, the condition in which they were at the commencement of the tenancy and in compliance with any such standards for the time being prescribed.

A landlord’s right to terminate tenancies as set out above, including the right to terminate a non Part 4 tenancy (of less than 6 months’ duration), recognises that vacancy will be necessary in some cases to carry out a substantial refurbishment or renovations. I have no immediate plans at this time to amend the RTA in this regard.

Comment on this