Dáil

Written answer

Energy Infrastructure

237. Deputy Roderic O'Gorman asked the Minister for Climate, Energy and the Environment if he will work with the DSO and TSO to accelerate the timeline for implementation of hybrid grid connections for battery, wind and solar projects. [78607/26]

Comment on this
Darragh O'Brien Minister for Climate, Energy and the Environment Fianna Fáil

The Commission for Regulation of Utilities (CRU) is responsible for grid connection policy including hybrid connections. The CRU is an independent regulator, accountable to a Committee of the Oireachtas and not to me as Minister.

Under Climate Action Plan 23 the CRU is tasked with ensuring that hybrid technology grid connections are facilitated. Work on this action is progressing. In April 2026, the CRU published a decision paper on the Sharing of Maximum Export Capacity. The decision allows for multiple generation assets to share a single grid connection point. This work follows their January 2024 decision paper on removing the Installed Capacity Cap.

As part of the CRU decision paper on Sharing of Maximum Export Capacity (MEC), the System Operators, EirGrid and ESBN Networks, were tasked with developing a roadmap outlining the steps required to implement MEC sharing. This implementation roadmap was published in June, and work is ongoing to deliver on its programme of activities. The System Operators are responsible for implementing the CRU decision and, in this regard, operate independently of me as Minister in the exercise of their respective functions.

My Department engages with the CRU and System Operators on a continuous basis and receives updates on the status of their hybrid connections policy through the Connections Working Group. The group provides coordination and support to the development of connection policy and reports to the Accelerating Renewable Energy Taskforce.