Written answer
Electric Vehicles
130. Deputy Martin Daly asked the Minister for Transport the plans in place to expand the provision of publicly accessible electric vehicle charging points, particularly fast and rapid charging facilities, in rural towns and communities across Roscommon and East Galway; whether additional funding will be made available to local authorities to address gaps in charging infrastructure in towns such as Boyle, Castlerea, Ballaghaderreen, Ballygar and Roscommon town; and if he will make a statement on the matter. [78354/26]
Comment on this
The Government is fully committed to supporting the expansion and modernisation of Ireland’s electric vehicle (EV) charging network. A comprehensive and reliable charging network is essential to support the continued uptake of EVs and Ireland’s transition to sustainable transport.
To meet Ireland’s obligations under the Alternative Fuels Infrastructure Regulation (AFIR), it is estimated that between 3,200 and 6,210 publicly accessible charge points will be required nationally by 2030, depending on the power output of the charging infrastructure installed. AFIR requires Member States to provide 1.3kW of publicly accessible charging capacity per battery electric vehicle (BEV) and 0.8kW per plug-in hybrid electric vehicle (PHEV).
The National EV Charging Infrastructure Strategy 2026-2028, published 4th November 2026, sets out the requirements for publicly accessible charging infrastructure and the actions needed to meet future demand.
Ireland has made significant progress in EV charging roll-out in recent years. While most EV charging is expected to take place at home, supported through the Home Charger Grant and Apartment Charging schemes, a strong public charging network is required to support longer journeys and drivers who do not have access to private off-street parking.
Support has been allocated through the Light Duty Vehicle (LDV) National Road Grant Schemes, which provide funding towards the installation of more than 500 high-powered recharging points on the national road network, prioritising fast and ultra-fast charging facilities. In particular LDV 1, LDV 2 and LDV 3 would support delivery in the area detailed. ZEVI is also supporting local authorities in developing regional and local EV charging network strategies and implementation plans. This work will identify regional and local charging requirements, including destination and neighbourhood charging solutions for residents without access to private parking.
In addition, ZEVI is supporting 26 Local Authority EV Charging Pilot Projects across the country to accelerate the delivery of destination charging infrastructure. The first pilot in Westside, Galway City, was completed in 2025. The second pilot project to be completed was in Áras an Chontae, Roscommon. Both of these pilots include the provision of fast charging facilities and will be representative of what will be delivered at scale in the future by Local Authorities following the Local Authority EV Infrastructure strategies and implementation plans. The pilot in Roscommon uses behind the meter solution to reduce operational costs associated with large connections and discounted neighbourhood rates for those without driveways.
The €15 million Shared Island Sports Club EV Charging Infrastructure Scheme is supporting the installation of publicly accessible EV charging infrastructure at community sports clubs across the country, including sites in Galway and Roscommon.
Collectively, these measures will support continued EV uptake, address gaps in charging provision and accelerate the development of a reliable, accessible and future-proof charging network with a focus on user-needs.