Financial Statements 2025: Uisce Éireann
Uisce Éireann reported 2025 revenue of about €1.8 billion and capital investment of €1.43 billion, with profits reinvested in infrastructure; the Comptroller and Auditor General issued a clean audit opinion. The CRU’s €31 million reduction in future allowed revenue for missed leakage and non-domestic collection targets was accepted by the utility, which said it would deliver efficiencies to absorb the impact. Uisce Éireann outlined a €12.2 billion investment programme focused on network upgrades and housing capacity, while acknowledging ongoing service and communication challenges. Committee members also questioned executive pay and performance awards, the funding model, procurement transparency and the pace of local projects.
Contributions 209–426 of 1,084. This sitting's record is too long for one page, so it is split into 5 parts.
It is a similar trend. Is Uisce Éireann happy enough spending that much of taxpayers' money? Does it think that is okay?
Comment on this
Mr. McCarthy tried to put me off by saying that Uisce Éireann only spent €3.8 million but, and I have the figure in front of me, it was actually €5.8 million.
Comment on this
The €5.8 million was legal costs and settlements, absolutely. I need to be clear and there is one important thing I need to talk about here, and it is worth noting. You can see that the number of legal cases has increased significantly from 41 to 54. That is primarily due to judicial reviews and us having to defend judicial reviews for environmental and planning situations. Perhaps Mr. Laffey or Ms O'Dwyer will come in on that.
Comment on this
To get the required statutory consents for our projects we do have to acquire a lot of different things. Planning is just one-----
Comment on this
Planning is just one statutory consent. We also have to acquire environmental licences, marine licences, land acquisitions and CPOs.
Comment on this
Going forward, with the huge need for houses-----
Comment on this
-----will there be a lot more legal fees required to CPO land and things like that?
Comment on this
Potentially. There had been an increase in the judicial reviews, both the ones directly challenging our consents but we have also been a notice party on the judicial reviews associated with the projects of others where there could have been a connection to a water or wastewater network. Obviously, in these cases, we do seek to defend those decisions. Again, as we mentioned earlier, with the accelerated infrastructure task force, a lot of work is happening through that to challenge that.
Comment on this
We would hope not. This is where you are really appealing to the public. All of these projects are usually being driven in the interest of providing housing but also to improve the environment.
Comment on this
As we go forward with planning and more consenting, the people who are objecting to these projects will use the judicial review system to try and slow down the projects. It is kind of outside of our control but we definitely have to defend them because we need the projects to progress.
Comment on this
That is okay. I would like to move on to my next point please. On public relations and consultants, how much did Uisce Éireann spend in 2025 on public relations?
Comment on this
On public relations specifically, €245,000.
Comment on this
How much has Uisce Éireann spent in 2026?
Comment on this
I do not understand why Uisce Éireann needs to spend taxpayers' money on public relations while trying to provide a service. It is not like it has any competition in the market. Am I correct in saying that?
Comment on this
Most of the work we do is information. It is keeping people informed on what is happening with projects. It is public consultations. It is negotiations around road closures, outages and all that kind of stuff. The vast majority of spend is on that. We also would train staff internally to go on radio shows, Newstalk and Ireland AM. They can be quite intimidating so we want them best prepared, including this scenario, which can be quite intimidating for staff, so we do spend on training for this as well.
Comment on this
It is important to remember the volume of press releases, media queries, etc., that come in that we have to respond to. Many of them are connected to our capital investment plan and that all has to be addressed as well. That is all part of it.
Comment on this
How much did Uisce Éireann spend on media training in preparation for this meeting?
Comment on this
It is about €4,000. It cost €4,000 for this one.
Comment on this
It is €4,000 every time. Why does Uisce Éireann need that? I cannot understand why Uisce Éireann needs media training before attending this committee.
Comment on this
I am sorry, Deputy, but this is a fairly intimidating scenario and all of my staff-----
Comment on this
If you just come in here and tell us what is happening, you should not be intimidated at all.
Comment on this
Sorry, it is intimidating coming in here. There is no doubt it, especially for a lot of my staff who would have regular jobs and not necessarily be out in the public that often. So, I think it is good. Also, we get trained to give Deputies the best answers possible so that we can be succinct and get across-----
Comment on this
The "best answers" is a joke. All the witnesses have to do is tell me the truth.
Comment on this
There are no "best answers." It is just to come in here-----
Comment on this
I think it is how we articulate stuff and how we get through stuff quickly.
Comment on this
How much did Uisce Éireann spend on ICT in 2024 and 2025?
Comment on this
On ICT specifically, in our accounts you can see that it cost €58 million in 2025.
Comment on this
Does Uisce Éireann spend €58 million every year on ICT?
Comment on this
Uisce Éireann did not spend that in any other year, just that one particular year.
Comment on this
No. Just hear me out. Sorry, Deputy-----
Comment on this
I do not want "obviously" or nothing. I just want figures for every year.
Comment on this
Yes, I know. Just hear me out on this. Uisce Éireann is going through transformation. We are bringing 31 local authorities into the organisation so we do need to have the systems, the connectivity and all of that.
Comment on this
I will go back to my questions. How much did Uisce Éireann spend on ICT in 2024? Does Mr. McCarthy know how much it spent on ICT in 2024?
Comment on this
I would have to go back to the accounts and then I can help the Deputy.
Comment on this
Mr. McCarthy is telling me that in 2025 it was €58 million.
Comment on this
I completely agree but remember that we are touched right across the country and it is absolutely necessary to improve connectivity and business planning to ensure that we can deliver the capital investment plan and report on it appropriately to everyone that needs to-----
Comment on this
Does Mr. McCarthy feel that Uisce Éireann is delivering that capital investment?
Comment on this
We are delivering capital investment, absolutely.
Comment on this
Does Mr. McCarthy feel that taxpayers are getting value for money?
Comment on this
I would say absolutely and I have the quote on that. Any ICT expenditure that we have comes within our regulatory allowance. It is not part of something separate or anything like that.
Comment on this
It just worries me when we think €58 million is normal to spend but then again when we go-----
Comment on this
I certainly do not think it is normal but the Deputy is spinning the context of the €12.2 billion and in the context of the transformation-----
Comment on this
That is okay. I would like to move on to my next question.
Comment on this
I thank Mr. McCarthy for his answers. He has answered my question.
In relation to Mr. Gleeson's salary, I have to say he must be doing an amazing job in Uisce Éireann. His salary in 2025 increased by €118,000. Why would that happen? How does somebody's wage increase by €118,000 in one year?
Comment on this
It is a very significant salary. I am well-paid - I admit that - compared to a lot of other people in the country.
Comment on this
A lot, yes. All the public servants who were out yesterday have to go on strike to look for a minuscule increase in their wages but Mr. Gleeson can get €118,000. I would like to know how that happens or who signs off on that.
Comment on this
Over the past three years or so, there was an independent review of all CEO salaries in semi-State bodies. It was independently reviewed. Our board took those recommendations and, tick-tacking with the Minister, agreed to a new level of salary for the CEO and that-----
Comment on this
After the Minister has already given Uisce Éireann, as Deputy Neville said earlier, an additional €600 million it does not actually require and was not needed, he also gave Mr. Gleeson €118,000 in a salary increase. I find it shocking. I will tell the witnesses about the people in Monaghan where I come from in Scotshouse. They have been trying to get water connected to their houses which is not happening. Uisce Éireann has not connected them. I have sent Uisce Éireann emails but it has not responded to me. As a member of the Oireachtas and a TD, I expect to get a response to an email from Uisce Éireann, which is not happening. I really wonder why the Minister would have allocated an additional €118,000 while we as TDs cannot even get responses from Uisce Éireann. The people in Scotshouse are suffering from terrible water. They have brown water or welled water, and they cannot get Uisce Éireann to provide them with good-quality water. Something needs to change. Uisce Éireann needs to ensure the people in Monaghan and Cavan have access to good clean water. That is not happening. For Mr. Gleeson to have an increase of €118,000 in his salary, I do not know how he can sit here comfortably and condone that. I honestly do not.
Comment on this
I will ask Mr. McCarthy to go through the process of how that was achieved.
Comment on this
Did Mr. McCarthy get an increase in his wages last year?
Comment on this
The witnesses are in front of us. We are supposed to get answers. That is why witnesses come here.
Comment on this
Maybe the media training told the witnesses not to answer that kind of question but we are actually here to find out-----
Comment on this
Can I explain the situation in relation to wages? My salary is public. In my contract, I was told my salary would be made public. Nobody else in the company is obliged to declare their salary. That is our position but if you look at our-----
Comment on this
I think they should be obliged when the taxpayer is paying is paying €10 billion.
Comment on this
-----annual report, the Deputy will see the brackets broken down, up to €275,000, in €25,000 tranches. That is sufficient information to show how people are paid. People are well-paid. Mr. McCarthy did get a pay increase on a substantial salary of 3% but that is the market we live in. I have a good team all the way from operators up to-----
Comment on this
Mr. Gleeson must have an amazing team. Good would not qualify for this amount of money Uisce Éireann gets from the taxpayer Am I correct that it is €10 billion?
Comment on this
The €10 billion will go to fixing problems like the ones in Scotshouse.
Comment on this
Again, I have to ask, is the taxpayer getting value for money?
Comment on this
I thank the witnesses for being before us. The previous question Deputy Bennett asked about pay and the question Deputy Dolan asked about procurement highlight the difficulty with Uisce Éireann's governance. While it is structured as a utility, which is a legacy of what happened, it is substantially funded, 80%, by the State. If any other body were before us that had that level of State funding, asking the salary of individual employees or looking for that level of detail would be normal. I highlight that because I do not think there was anything untoward in either Deputy asking those questions. The level of funding for Uisce Éireann puts it in a different category from other utilities. That is a comment.
I would like to deal with a number of items in the audit accounts for Vote 34. In note 6.5, there is a reference to fraud at local authority level in regard to the provision of water services. Will the witnesses outline the exposure of the State? What is the scale of it?
Comment on this
It is relatively small. I will not give a number because it is a very live case at this point and there has been some movement on it over the last while. This is a legacy case that has-----
Comment on this
My other question concerns the €55 million for the Local Government Fund to deal with the stranded costs in local authorities. That is effectively €55 million that was provided to local authorities for costs they could not transition over to Uisce Éireann. Is that correct?
Comment on this
It may be closer to Mr. Munnelly's area.
Comment on this
Those are the costs they could not transfer.
Comment on this
Why was Uisce Éireann not able to take up those costs?
Comment on this
It was not that Uisce Éireann was not able to take up the costs. It was that the local authorities were left with those costs.
Comment on this
They were costs associated previously with the provision with water. That is what the note says.
Comment on this
The local authority and the Department were not able to move those costs entirely over to Uisce Éireann. Is that correct?
Comment on this
A lot of it was the corporate side of local authorities in terms of their accounts, payroll and HR, and even shared buildings and services so the cost of that-----
Comment on this
Yes. Legacy pensions form part of that as well.
Comment on this
That is understandable but local authorities getting an extra €55 million for costs that had previously gone with Uisce Éireann sounds likes Uisce Éireann was bailed out by another €55 million. Is Mr. Munnelly saying that is not the case?
Comment on this
That is not the case because Uisce Éireann has to provide those services itself.
Comment on this
In regard to the legacy environmental water issues, €8 million was provided but the out-turn was only €2.4 million. There was an underspend related to developer-provided infrastructure. That is a substantial failure to deliver, to put it in those terms. Why has that happened? The full estimate was €8 million, only €2.4 million was spent and delays at the developer end are being cited.
Comment on this
The budgets have been assigned. I think it just slow delivery on the projects across-----
Comment on this
That is clear from note B.7 but the question is what is being done to make it happen?
Comment on this
They are following up with the relevant local authorities on delivery. I can come back to the Deputy with a note on that.
Comment on this
Will Mr. Munnelly provide the committee with a list of projects it relates to?
Comment on this
As I say, this committee deals with overspends but we also deal with underspends because that is a failure to deliver the service. Is that not then an Uisce Éireann service?
Comment on this
No, that is through the Department. I think what the Deputy referred to was the Vote of the Department, not the Votes of Uisce Éireann.
Comment on this
Does note B.7 on legacy water issues fall under Uisce Éireann's overall allocation or is it a matter for the Department?
Comment on this
Those private developers are providing water infrastructure. Do they become public assets? Do they transfer to Uisce Éireann?
Comment on this
Yes. Once they are remediated, they will transfer over.
Comment on this
They go onto the asset book of Uisce Éireann once they are completed.
Comment on this
There is obviously an obligation on Uisce Éireann to also see that those projects are completed because they take the strain off the overall system. Does Uisce Éireann have a mechanism within its governance to ensure those projects or is that something it only deals with when they are remediated?
Comment on this
There are about 530 developer provided infrastructure, DPIs, across the country. As of 1 January 2024, we are responsible for them so we are essentially giving the same service to those DPIs that the local authorities were giving. They are private assets. Therefore, we have to remediate those assets at a cost to the public. Once they are remediated, we need to apply for a licence from the EPA. Once they are fully licensed, we will take them completely into public ownership. They are very complex.
Comment on this
I experienced this in a place called Hampton Wood in my area. A water tower was built as part of the development that was intended to be in the ownership of the management company forever, which was a crazy way of providing water services.
That was remediated a long time ago. Is that the type of project Mr. Laffey is talking about?
Comment on this
Correct. I am referring essentially to on-site wastewater treatment systems. We also have 55 private water supplies that we are looking at.
Comment on this
Okay. I have just two other issues. I was dealing with the rezoning on the Dunsink lands in Fingal. It is a huge project. Fingal County Council is proposing a new town of 45,000 people in Dunsink, and there is a submission by Irish Water stating it would not be possible to service it until the Shannon link is in place. Is there a date of operation for that link?
Comment on this
Where we are with the water supply project at the moment is that the planning application has been with An Coimisiún Pleanála since December last year. We are-----
Comment on this
Does Uisce Éireann have a projected operational date?
Comment on this
We have a plan at the moment that would see water coming into supply in 2032.
Comment on this
Yes. We are hoping to be in a position to start construction in 2028.
Comment on this
Without delays and with all the caveats, we are talking about the mid-2030s.
Comment on this
Two thousand and thirty-two. It is a critical project. We are looking at everything we can do to advance the timeline at the moment. Again, having political support for this project, having all Government agencies do everything they can to support us in the delivery of this-----
Comment on this
I have been supporting that project for nearly ten years. There has been a lot of guff around it from some parties.
On the bonuses issue, we are here again talking about the performance-related awards, PRAs. Some call them bonuses; some call them PRAs. In July, I asked that we would get a business case to compare the two systems, namely, the increment system, which gives 100% of public servants an increase each year on the baseline contract, and the bonus model, which Uisce Éireann says provides better delivery. It is not saying it is cheaper. I do not know if it is cheaper, but that is what the public accounts committee is interested in. For example, if those in Uisce Éireann operated the standard increment system that every other civil servant, such as the witnesses' colleagues here from the Department of public expenditure, operates under, its staff would get their increments every year regardless of whether they did well or badly. Uisce Éireann's argument is that, arguably, staff have to do well in order to achieve the bonus. I accept that argument but I do not see the paperwork, the maths, that backs it up. I do not see the paperwork that states that model is either less expensive or more expensive. Until Uisce Éireann makes the case in black and white, it is going to get the word "bonus" thrown at it every year it comes before the public accounts committee. Uisce Éireann is saying it is not fair to make the comparison because there are other people in the room who are getting an increment automatically every year. That is its case, but what I am saying is that, until it actually puts the two models side by side and shows us the difference, if this costs ten times as much as the public service model, then it is not providing value for money. If it is costing less than the public service model, then we should be using it elsewhere. However, Uisce Éireann is not backing up its arguments with the numbers. Do the witnesses accept that? They are putting the argument to us that theirs is a better model than the increment model but they are not actually backing it up with numbers.
Comment on this
We have modelled it. We have absolutely modelled it ourselves, and there is not a huge difference between the two. Obviously, pension is a big thing-----
Comment on this
With respect, that is Mr. McCarthy's view, and we should deal in facts here. If he has confidence in his view and the model, he should just put the numbers in front of us and he will not get this every year. There will be headlines tomorrow, as there are every year, about how 97% of staff get bonuses when 100% of people in other Departments get increments. If he thinks the two are comparable, he should put the numbers in front of us. If he does not think so, the only conclusion we can draw from not being given the numbers is that it is costing too much. Does he accept that?
Comment on this
I think it is a fair point. We will take that on board. It is a good idea. We would have to take it over something like a 20-year period because you have to take pensions into account. There are quite big differences. Our staff are on defined contribution pensions. Public sector workers are on defined benefit pensions. It is complex enough, but I actually think the exercise is worth doing because I am a bit tired of the argument too. I think our system is fairly cost-neutral and drives performance but I do not want to be back in-----
Comment on this
I would not allow any other witness to give their view without evidence. I am saying Uisce Éireann should come in with the evidence.
Comment on this
Uisce Éireann got a clear audit opinion, which is positive and welcome. Well done on that. It is obvious there is a lot of good work taking place. I have always said that Uisce Éireann inherited the legacy of decades of underinvestment in water services, so that also has to be acknowledged. From the housing point of view, obviously, the Government has a significant housing plan to deliver 300,000 houses between now and 2030. We just spoke about the headroom, particularly in the greater Dublin area. I know there are plans there in terms of the water supply project, the main drainage project and so on. What is the current headroom in the Dublin area in terms of water, wastewater, demand and supply?
Comment on this
I might ask Ms O'Dwyer to come in on the drinking water side of things. Dublin is on a knife-edge in terms of drinking water and has been for a long number of years. We need an alternative supply in the city. We are very reliant on the Vartry Reservoir and the Liffey. Those are the two main supplies. We have three main treatment plants in the city, but if we lost one of those treatment plants we would not have a backup. That is the reality, which is not a good situation to have.
Comment on this
Let me put some numbers on that. We have been increasing our capacity year on year, but it is by doing minor upgrades to the treatment plants, improving-----
Comment on this
Over the last number of years, we got production capacity up to 652 megalitres per day. Our average daily demand this year is 655 megalitres, so that shows how tight it is. That has grown in the last-----
Comment on this
That is a tiny percentage of headroom.
Comment on this
A tiny percentage, yes. From an operations perspective, it is a constant challenge when we have to carry out maintenance work on our treatment plants. We can sweat our assets like we had to during the summer, when we had a huge increase in demand. The demand during the summer went up to nearly 700 megalitres per day.
Comment on this
I believe it was said that it would be 2032 before we would see a seismic change to supply.
Comment on this
So, between now and then, Uisce Éireann is really doing short-term, interim interventions.
Comment on this
Exactly. Reducing leakage, trying to get our-----
Comment on this
That sounds kind of worrying in the sense that, if we are to increase our housing supply significantly over the coming years, which is a top priority of the Government, is Uisce Éireann going to be able to supply the water?
Comment on this
We will if the water supply project comes through by 2032. These minor interventions, minor increases in production capacity and the management of our networks should mean that we are able to sustain supply until 2032. However, it is very tight, and we have no resilience in the event of an incident, like when we had the drought during the summer. If we have a cold weather event and demand goes up, we lose our resilience.
Comment on this
So it is extremely tight. I was going to bring up the summer dry spell. Obviously, there were a lot of prayers in the country from the agricultural sector and so on for rain. I suspect there were some prayers in Uisce Éireann as well.
Comment on this
Absolutely. We had a very busy summer, in fairness.
Comment on this
How close did we get to a major supply issue?
Comment on this
At one stage in the Dublin area in the middle of July, when the demand did get close to 700 megalitres per day, we saw a drop in our storage of about 50 megalitres. We could not keep up with the demand. However, we did go out with our water conservation messaging and we did introduce the water conservation order, and there was a fantastic response from the public to both of those. We saw demand drop down to 620 or 630 megalitres per day, so we came back within the sustainable production levels.
Comment on this
It is a very worrying time. If the dry spell had continued for another week or two, we would have been in serious difficulty.
Comment on this
Yes, if it had been prolonged and usage had stayed at that level.
Comment on this
What we did find was that when we made the conservation requests, considering that the big demand is from the general public, for watering gardens, paddling pools and all that kind of stuff-----
Comment on this
Okay. So when there are restrictions, it does work.
Comment on this
When people co-operate with us, we can flex through. We will manage the next few years if we do not get a big drought. The other thing I would point out is that we were quite lucky this summer because we had quite a wet winter, so our raw water storage in Dublin was in very good shape. It was a matter of our capacity issues. However, if we had a combination of a dry winter and a dry summer, then we could have trouble.
Comment on this
I appreciate that. I will try to move on, if I can. In terms of water main rehabilitation works. I note that Uisce Éireann rehabilitated 195 km, which is obviously a significant amount. What percentage of our water mains network is old asbestos piping?
Comment on this
We have 65,000 km of water network, and about 4,500 km of the network consists of old asbestos concrete mains.
Comment on this
Seven per cent or 8%, or thereabouts.
Comment on this
Okay. Is that a priority in terms of rehabilitation? Obviously, there are different priorities. I understand that where there are a lot of breakages and where local authorities are carrying out resurfacing work and so on, Uisce Éireann has to balance all the demands.
In my area, for example, an elderly gentleman rang me a couple of weeks ago saying he was shocked that asbestos piping is delivering his water. I think a lot of the public would be shocked by that. Is it a priority for the organisation to address that issue?
Comment on this
Not particularly. We actually remediate water mains on the basis of customer service and water quality. Where asbestos concrete mains at the end of their lives are going fairly regularly and impacting on customer service, we will move to remediate them. Asbestos concrete mains are perfectly safe. Ultimately, most of them are lined with some type of bitumen. Asbestos is not harmful if it is ingested. It is only harmful if it is aerosolised and in the air.
Comment on this
Uisce Éireann does not see it as a health issue.
Comment on this
Absolutely not, okay. On the same subject of old water mains, at a local level, it is a real frustration for people when they see the same stretch of water mains constantly breaking, causing constant disruption of service to households, businesses and others. They do not see Uisce Éireann coming along to do proper, long-term rehabilitation works. Will Mr. Laffey explain why that happens? Why do we see the same stretch over and over again? This is in large, urban areas supplying thousands of houses. I know Deputy Neville mentioned a case in his constituency. I have several such cases in my constituency. Why are those cases not prioritised?
Comment on this
Essentially, the spend we have every year on a capital basis is broken up pretty evenly between water and wastewater and treatment and networks. We are looking at spending probably between €200 million and €250 million this year on water main rehabilitation. Depending on the location, water main rehabilitation can cost up to €1 million per km. We are very constrained as to what we can do. We try to plan on a 12- to 18-month rolling basis the water mains we are going to rehabilitate-----
Comment on this
The constraint is funding as opposed to labour or capacity. It is funding.
Comment on this
No. We have the money. Essentially, we have to prioritise.
Comment on this
What is the constraint on doing more?
Comment on this
So it is funding in terms of doing more.
Comment on this
Turning to raw sewage discharges, in the opening statement, quite a positive presentation was put forward, with that figure of 38 out of the original 50 locations identified back in 2014. Nine of those have been removed by the EPA and three are under construction. That seems to be quite positive, but is it the full story? I presume there are plenty of other locations where raw sewage is going into waterways. Will Mr. Laffey provide us with the full picture?
Comment on this
Ultimately, when we were formed in 2014, there were 44 official agglomerations that we were responsible for that had raw sewage discharges. We then conducted a survey of the rest of the agglomerations across the country, and six more were added by the EPA. There are 50 in total. There may be locations where raw sewage is going into waterways, lakes or seas but they are not public agglomerations. They would be private in nature. We are working to remove all of the public agglomerations that are discharging raw sewage.
Comment on this
This is where there was no existing infrastructure. We have operational issues around the country with some of the plants that are older. We have had some challenges there, but that is separate.
Comment on this
I will provide an example. On the Point Road, Crosshaven, individual wastewater discharges are going into the water across the road. That is not counted as one of Uisce Éireann’s agglomerations.
Comment on this
I suspect it is not. As it is individual households discharging, that is not picked up as raw sewage being discharged into our waterways.
Comment on this
That is raw sewage being discharged by individuals. Ultimately, if there is a public network in Crosshaven, we might carry out a project to run a pipe down to pick up those particular individuals to bring them into the system.
Comment on this
Is that on Uisce Éireann’s radar? In terms of what needs to be done, obviously, a wastewater main needs to be brought down that road.
Comment on this
If that is not on Uisce Éireann’s radar, how does that happen?
Comment on this
It is not a priority for us in terms of expenditure. There are other places where we have to spend money. Given it is Crosshaven, if it is discharging into the sea, the environmental impact will be minimal. We have other places where the environmental impacts are much greater, so the funding goes there first.
Comment on this
I am caught for time. I will move on to developer-provided wastewater units. I suspect it is still Mr. Laffey who will answer. What is the quantum we are dealing with now of those that have and have not been taken in charge?
Comment on this
Is the Deputy referring to developer-provided water services infrastructure, DPI?
Comment on this
We are running pilots on 28 of those DPIs at the moment. We are carrying out surveys right the way across the country and we have divided them into four categories. The first category, essentially, contains those where we can do a wastewater line and connect them into a local agglomeration. Essentially, we will do away with the DPI. This goes up to category four, which contains some 40 or 50 locations across the country that are completely and utterly stand-alone. They are in the middle of the countryside. Remediating these DPIs is quite complex because they discharge the surface water. In some locations, the surface water is simply not available. There are issues as well with health and safety. There are also issues on the legal side with all of them. There is one particular wastewater treatment plant in Kerry, a DPI, in which seven individual landowners are involved, two of whom have died intestate.
Comment on this
Mr. Laffey mentioned 50 locations. There are a lot more DPIs than that provided on developments that have not been taken in charge. Do we have a number on those?
Comment on this
At the moment, we have been informed by the local authorities of 514 on the wastewater side and 55 on the water side.
Comment on this
There are 500-plus wastewater treatment units that are neither taken in charge by the local authority or Uisce Éireann. They are, effectively, being managed by the estates, developers or-----
Comment on this
Is it Uisce Éireann’s intention to, ultimately, take to all those in charge?
Comment on this
I would say it is going to take a decade because we are looking at costs of up to €1 billion.
Comment on this
It will cost €1 billion to do that.
Comment on this
Yes. That said, there are quite a number of those DPIs that are being very well managed and the housing estates in question do not want us coming in to take them in charge because, ultimately, if we take them in charge, they see further development, so they want to protect their asset. It is not all bad news.
Comment on this
I appreciate that. I thank the witnesses.
Comment on this
It is now just after 12 o’clock. We will take a short break. The meeting is now suspended for 15 mins.
Comment on this
Uisce Éireann is responsible for assets worth tens of billions of euro. How confident is Mr. Gleeson that he knows what Uisce Éireann owns and is responsible for? Is there a maintenance schedule?
Comment on this
Is the Deputy asking about a maintenance schedule?
Comment on this
I am asking if there is a maintenance schedule for all of the assets.
Comment on this
We have had a transition from the local authorities. We have taken over the assets of 31 local authorities. We have been doing that transition and it is only in the past year and a half that we have got direct control over the assets. I am going to bring in Mr. Laffey in a moment to talk in a little more detail-----
Comment on this
Mr. Gleeson is the Accounting Officer. I want him to confirm to me that he is satisfied that Uisce Éireann has a complete, verified and accurate asset register.
Comment on this
May I defer to Mr. Laffey to answer that question?
Comment on this
Mr. Gleeson is the Accounting Officer. Is he satisfied?
Comment on this
I have a large number of staff who help me out with some of these questions.
Comment on this
I appreciate that, but the buck stops with Mr. Gleeson. He is being paid well, as we already discussed. Is he confident that he has-----
Comment on this
The vast majority of our assets would be covered. There are still some stranded assets that we may not be using. There might be some dispute as to whether it is an asset of the local authority or an asset of ours but we know where the vast majority of assets are.
Maintenance-wise, I would say we are not in the best of places. Our maintenance needs to be severely improved. A run to failure-type system was operated previously. We need to introduce a predictive maintenance model. That will be a game-changer and we are starting to bring it in. Ms Attridge could talk about that.
Comment on this
Is Mr. Gleeson confident that assets handed over by local authorities this year are all on the Uisce Éireann asset register?
Comment on this
I will give an example of an issue. On 13 April 2026, a pump station at Barnageeragh Cove, Skerries, was formally transferred from Fingal County Council to Uisce Éireann. On 25 September, there was, as a result of an issue with this pump station, raw sewage leaking onto a public road in a residential area and onto the coastline. It was reported to Uisce Éireann and Fingal County Council. It was also reported to the Environmental Protection Agency, EPA. Uisce Éireann is saying it does not own the pump station. It is very clear that Fingal County Council handed it over to Uisce Éireann on 13 April this year. For three weeks, raw sewage has been coming out of the pumping station. It is absolutely unacceptable. We have the Bart Simpson approach from Uisce Éireann. It is saying, "It isn't us" or "It wasn't me." It is simply unacceptable. How are we supposed to resolve these issues? I assume this situation is not unique.
Comment on this
I am not aware of the specific issues in Skerries. It is something we can look into
Comment on this
No one seems to be aware. Uisce Éireann is responsible but is not dealing with the issue. That is not good enough.
Comment on this
We will have to find out why we are saying we are not responsible. It sounds strange, but I do not think any of us in the room have the details.
Comment on this
Even stranger is that on the same day that Uisce Éireann phoned one of the local councillors to say that it was responsible, Uisce Éireann also sent an email to a member of the public saying it was not responsible. What is going on in Uisce Éireann? People are asking me what kind of circus Uisce Éireann is.